Short Company profile

Trace Group Hold JSC - Sofia


Contacts

Sofia, 1582
96 "Prof. Tsvetan Lazarov" Blvd., entrance B, floor 12
phone: 02/9657940,042/613713,613711
fax: 02/9657943
e-mail: tracegroup@tracebg.com
WEB-site: http://www.tracebg.com
 

Company Figures


BULSTAT: 123682269
VAT No: BG123682269
Reg No: 255/2005
No of employees: 159 (2025)
Profit/Loss (thous. BGN): 39 780 (2024)
Total revenue (thous. BGN): 580 019 (2024)
Fixed Assets (thous. BGN): 46 282 (2024)
Capital (BGN): 24 200 000
 
 
 

Branch: Construction of roads and motorways
Licences & Certificates:  Certificate ISO 14001 Certificate ISO 9001 Certificate OHSAS 18001 Issuer Public company Registered building company
Membership: Bulgarian Industrial Association
General Meetings: Last - 30.06.2025 
Registered Actitity: acquisition, management, assessment and sale of stocks in local and foreign companies, bonds, patents, design, construction and reconstruction of roads, road facilities, repair works, sale-trade, trade representation and mediation, trade in industrial goods and oil products, commission, shipping, transport, license and warehouse deals, foreign trade, any other activity not forbidden by law
 

19.11.2025

"Trace" and VDH with the lowest price for the railway line to the tunnel with North Macedonia Four candidates submitted bids in the public procurement for the construction of the last railway section from Gyueshevo to the border with North Macedonia with a length of 2.4 km and an estimated value of 114 million leva excluding VAT. The lowest price offer is from the "Gyueshevo 2025" consortium, in which "Trace Group Hold" and "VDH" participate - 97.97 million leva excluding VAT. The remaining three offers are over 100 million leva, with two being below the estimated value, and only that of the "European Station Gyueshevo 2025" DZZD is for nearly 139 million leva excluding VAT. The consortium includes "Parsek Group" EOOD, "Infra Rail Bulgaria" EOOD and PIMK OOD. The other two proposals are from "Geostroy" AD (nearly 111 million leva excluding VAT) and "Consortium Engineering Railway Infrastructure Sofia 2025" DZZD (113.7 million leva excluding VAT). The consortium includes "ZMBG" EAD, "Eurostill" EAD and the Chinese "Tianjin Oubaiwei Co." The foreign company is engaged in trade and insurance, has no experience in railway construction. The choice of contractor will be determined by the optimal price-quality ratio. The public procurement for the last 2.4 km from the railway station in Gyueshevo to the border with North Macedonia is for engineering - design and construction. In addition to the construction of the railway, the reconstruction of the Gyueshevo railway station, which will become a border passenger and freight station for Schengen, is also planned. The deadline for completion of the activities is by the end of 2028 for the entire section, except for the last 420 meters to the tunnel.

Eurostyle LTD - Sofia Geostroy JSC - Sofia Parsec Group PIMK LTD - Markovo - Pd SMBG JSC - Sofia Trace Group Hold JSC - Sofia VDH JSC - Sofia 
 


News

  page 1 / 113   page    
19.01.2026: Trace Group Hold AD (T57) Notification of a signed contract...
08.01.2026: "Geostroy", "Trace Group Hold" and "GP Group" will triple the...
23.12.2025: NRIC allocated over 500 million leva for the railway line to...
08.12.2025: Trace and GP sign contract for over 900 million euros for the...
05.12.2025: Trace Group Hold AD (T57) Notification of signed design and...
30.11.2025: Trace Group Hold AD (T57) Trace Group Hold AD presented its...
19.11.2025: "Trace" and VDH with the lowest price for the railway line to...
01.10.2025: Seven candidates submitted bids in the tender for the...
26.09.2025: According to data from the Bulgarian Enterprise Information...
03.09.2025: Trace and GP Group win tender for Bucharest metro Two of the...
 
This company profile is visited 15 886 times
[2026: 129, 2025: 2 124, 2024: 2 041, ... ]